Rock Creek Ranch - Superior, Colorado
A 1,600 acre mixed use project annexed to the Town of Superior.
Client
Richmond American Homes
6550 S. Greenwood Plaza Blvd., #300
Centennial, CO 80111
Contact: Tim Garrelts
Phone: 303-220-4434 Planner: EDAW / Norris Design
Street design, drainage study, and erosion control plans, design surveys, and horizontal and vertical control for aerial photogrammetric topographic maps for 13.0 miles of district streets including 3.5 miles of McCaslin Boulevard, a major Boulder County arterial.
Superior Metropolitan District No's. 2 and 3
District Street Improvements
- McCaslin Boulevard 11,680 LF 6 lane arterial street with 16' median
- North Alkire Street 5,715 LF 6 lane arterial street with 16' median
- South 88th Street 2,450 LF 6 lane arterial street with 16' median
- West 140th Avenue 5,325 LF 4 lane arterial street with 16' median
- West 128th Avenue 8,245 LF 4 lane arterial street with 16' median
- North Indiana Avenue 4,435 LF 4 lane major collector with 14' median
- (Involved with Service Plan Preparation)
- (Detailed Quantity/Cost Estimates for each, bidding and contract documents)
Various Coordination Efforts Involving
- Structural consultants for new bridge superstructure over Coal Creek
- CDOT on relocation of S.H. 170
- RTD on existing Park 'N Ride expansion
- W470 Task Force on alignment alternatives
- Traffic consultant on access analysis; time/space signal progression, etc.
- Soils consultant for test hole inventory and pavement design
- Aerial mapping and control
- Landscape architect on streetscape and existing tree survey addressing sensitivity to environmental concerns
- U.S. West on fiber optic telephone line installation with impacts on future construction
- FRICO on relocation of the Community Ditch (irrigation canal)
- Utility companies for sleeving locations
- Adjacent property owners on ROW acquisition and annexations
- Channel improvement for Coal Creek at McCaslin Bridge (processing with UDFCD and potentially FEMA)
- Bike path and route incorporation
- Drainage Studies - storm sewer design, inlets, box culverts, detention ponds, erosion plans, water quality features
- Master infrastructure considerations (water treatment plant, waste water treatment plant)
- Preparation of entire specification and bid document package for street and related improvements
- Master Plan Study for Town of Superior
- Sanitary sewer main analysis and sizing including planning for phasing of construction. Final water and sewer design. Coordinated work through District Engineer preparing wholesale facilities
- Final Plat and Construction Plan preparation and processing for ± 2000 Single family units and ± 2000 Multifamily units.